Council research · November 2026
Agentic Risk Register
What happens when an AI agent has permission to act and gets the decision wrong?
Explore 200 scenarios across 20 sectors. Open a row to see what the agent does, who bears the harm and how to test the proposed control.
Study lead Adrian Dunkley · Caribbean AI Risk Management Council
Explore the register
Download all 200 rows (CSV)Loading scenarios…
| Scenario | Sector | Failure type | Gross mean | Residual mean | Residual P95 |
|---|
Method and evidence
What the numbers mean
Gross mean is the average annual loss before the proposed controls. The residual mean is what remains after prevention and containment. The 95th percentile (P95) is the smallest amount that covers at least 95% of simulated years. Rare harms can have a P95 of zero. Before setting one aside, inspect its chance of any annual loss and the average loss in its worst 5% of simulated years.
Annual event counts follow a Poisson distribution. Event costs follow a lognormal distribution. A larger spread on the log scale means a wider range of possible costs. Each control has an assumed chance of preventing a loss and an assumed share of the surviving loss it can contain. A weaker-control run halves both effects. Case owners can inspect the inputs and reproduce the results using the study files.
Cases can overlap or depend on the same supplier. Adding the rows would imply a portfolio the study never observed. Harm to privacy, safety and access appears in words alongside the financial exposure. The rates, losses and control effects come from constructed cases. The study used no incident records.